Stormwater / Rainwater Management Plans – Representative Projects

When land is developed the quality of the water flowing from the site must be maintained so that our rivers and streams and coastline are not degraded. There are a number of tools that are used. Typically these are incorporated into the development itself and include erosion control plans, infiltration swales, absorbent topsoils, constructed wetlands, ponds and natural area set asides. Outlook aims to have optimized site infrastructure environmentally while minimizing construction and any maintenance costs.

Bio‐swale Mer et Montagne Elementary School, Campbell River
Fisheries enhancement wetland Creekside Commons, Courtenay
BC Hydro Operations, Campbell River
BC Hydro Operations, Campbell River
Re-constructed portion of Courtenay Riverway
Rainwater management plan for 12 acre commerial site, Saltspring Island
Bio‐swale at Sliammon Health Centre, Powell River